
Two Gecco Floor Paint - Inorganic Primier
Brand TWO GECCO
Product origin Foshan,Guangdong
Delivery time 30 days after payment
Supply capacity 1000 tons per month
1 Excellent adhesion.
2 High hardness and good wear resistance.
3 High glossiness.
4 Good weather resistance
5 Good stain resistance
Product description
This product consists of water-based epoxy resin with water-based curing agent, functional additives and water, etc. It is water-based and environmentally friendly, with good generality, no irritating odour, long usable time, good permeability and high bonding strength to concrete substrates, mainly used as primer for indoor and outdoor water-based epoxy flooring projects, with waterproof, alkali-proof and anti-corrosion properties.Application areas can be used in factory buildings, shopping malls, exhibition halls, office buildings, schools, especially outdoor car park flooring, etc.
Product index appearance
Component A: light yellow liquid paint Component B: milky white liquid Dryness (25°C)
Thickness 30-60 um
Surface drying time≦2h
Completely cured 12-24h
Construction time limit:≧6hCoating volume 6-10㎡/㎏Construction reference
Suitable for rolling, brushing, before use to mix the material, according to the ratio of accurate weighing into the spare clean barrel, and then add the amount of paint 5-10% clean water to mix well, before the construction of the substrate must get good treatment, including dust removal, oil removal, decontamination and other treatment; the substrate must not have stagnant water * construction environment humidity should be < 85%, the temperature between 5 - 40 ℃, the ideal temperature of 15-35 ℃ The ideal temperature is 15-35℃, and ventilation should be maintained. The ratio of open dilution: component A colour paint : component B curing agent : tap water = 2 : 1 : 0.1-0.2Storage and transport
Store in a cool and ventilated room, room temperature should not exceed 40℃ to avoid gelation and solidification of the paint, shelf life is 12 months.Precautions
a. The room temperature of the storage environment should not exceed 40°C for a long time to avoid gelation of the material.
b. The paint must be mixed well before use before the next step.
c. After mixing, the paint must be stirred evenly before spraying.
d. Please do not pour the remaining material into the sewer to avoid pollution.
e. Do not mix with other brands of paint or add other solvents.
f. If splashed in the eyes, please wash with plenty of clean water or seek medical attention.