High Elastic Sealing Waterproof Coating
  • High Elastic Sealing Waterproof Coating
  • High Elastic Sealing Waterproof Coating
  • High Elastic Sealing Waterproof Coating
  • High Elastic Sealing Waterproof Coating

High Elastic Sealing Waterproof Coating

Brand TWO GECCO

Product origin Foshan,Guangdong

Delivery time 30 days after payment

Supply capacity 1000 tons per month

Product selling points
1 Good adhesion to the substrate, excellent workability
2 Good anti-penetration function
3 Humid areas can be directly trial work
4 Good brush feel, excellent workability
5 Good workability, can be rolled and brushed
6 Good water resistance, can be used in a long-term water immersion environment

High Elastic Sealing Waterproof Coating

Description
Waterproofing is no longer a new topic, whether it is tunnels, bridges, dams, roads, buildings, or the houses we live in every day, waterproofing can not be ignored. At the same time, the electrical products we use in our daily life also have waterproofing and moisture-proofing problems that must be faced head-on.

Tapping K11 general roller coating type waterproofing slurry is a polymer modified two-component cement-based waterproofing slurry, from imported polymer emulsion, high-quality cement, active chemicals, fine aggregates and a variety of additives compounded, with high bond strength, good impermeability characteristics, can be used for mortar, concrete structure waterproofing treatment.


High Elastic Sealing Waterproof Coating
Environmental standards
Comply with EU environmental standards
Product usage
Kitchen, bathroom, sink, garage, tunnel, wall and floor, and other moisture return parts, especially for paste tile waterproofing projects.
Product specification
18 KG
Product Color
Blue or Gray
Product ratio
1:2.78
Drying Time 
Surface drying 2-4 hours, maintenance time 48 hours
Reference dosage
2-3KG/m²
Construction conditions
5-35°C,avoid rainy day construction
Thickness
1.0 mm - 1.5 mm
Packaging
Two bags each of A component emulsion and B component emulsion
Construction method
Emulsion first and then powder, mixed and stirred evenly, wet the base surface and then evenly rolled on the base surface 1-2 times, closed water test after 48 hours of construction.